Thought I document the plunge pool project that I've undertaken. So far its all site prep. The pool is currently being built up the coast and will arrive fully tiled and basically ready to swim once the filter is hooked up. The pool is pre cast concrete and measures 3.5 mt in diameter and 1.4 mt high. because its poured in a mould upside down, the top ( bottom of pool) is finished by hand and is therefore not perfectly flat. Therefore, the pool has to sit on a bed of 5 mm gravel to avoid point loading. So, in the following photos we have the formwork set up to pour border to contain the gravel. I set it up with the laser level and its pretty spot +/- 1 mm so I'm happy. Next is moving the gravel. 1.6 m3 in a barrow - bugger. Using the laser level to screed the gravel dead flat. The pool arrives on the 29th of November and is craned into position on the 30th. More pics when it arrives.
Comments